Installing a high-temperature sintering furnace correctly is only the first step. Proper commissioning is essential to ensure safe and efficient operation. Here’s a step-by-step guide:
- Pre-Commissioning Setup – Follow the equipment’s general layout, foundation plan, and water, electricity, and gas system diagrams to correctly restore and position the furnace.
- Connect Utilities – Ensure all internal and external water, electrical, and gas supplies are properly connected.
- Verify Connections – Double-check that all connections are correct and secure before proceeding.
- Initial Equipment Checks – Before using the furnace, confirm that all control switches are in the off or designated positions. Start the water, electricity, and gas supply systems to ensure the furnace has full utility support.
Following these steps ensures that your high-temperature sintering furnace operates safely and efficiently.